Plug-In Solar in Maine

Governor Janet Mills signed LD 1730 in April 2026, making Maine the second state to legalize plug-in solar. Maine is the only state with a two-tier system: small systems are DIY, larger ones need a licensed electrician.

Last updated:

Is plug-in solar legal in Maine?

Yes. LD 1730 is in effect (effective date: July 2026). You can plug a qualifying, certified solar device of up to 1,200W into a standard outlet without a utility interconnection agreement.

Maine at a Glance

Status
Legal — In Effect
Bill
LD 1730
Signed
April 6, 2026
Effective
July 2026
Watt limit
1,200W
Utility
Notify your transmission and distribution utility within 30 days of installing.
Certification
Safety certification required; UL 3700 is the referenced standard.

What the Law Allows

  • Systems up to 420 watts can be installed by the customer by plugging into a standard outlet
  • Systems between 420 and 1,200 watts must be installed by a state-licensed electrician
  • Customers must notify their utility within 30 days of installation
  • Not eligible for net energy billing

Renters, Condos & HOAs

Check your lease for placement rules before installing.

Read our renter's guide to plug-in solar →

Good to Know

The 420W DIY threshold is lower than in any other state. Most 800W "balcony solar" kits will need an electrician in Maine.

What to Do Next

  1. 1Pick a certified kit within the watt limit. Look for UL 3700 or an equivalent NRTL listing.
  2. 2Utility: Notify your transmission and distribution utility within 30 days of installing.
  3. 3If you rent or live in an HOA, read your lease or covenants and give any required notice.
  4. 4Use a dedicated, GFCI-protected outdoor outlet and never plug into an extension cord or power strip.

Maine Plug-In Solar FAQ

Is plug-in solar legal in Maine?

Yes. LD 1730 is in effect (effective date: July 2026). You can plug a qualifying, certified solar device of up to 1,200W into a standard outlet without a utility interconnection agreement.

How big can a plug-in solar system be in Maine?

The Maine limit is 1,200W. That is enough for a typical two- to four-panel balcony kit.

Do I need to notify my utility in Maine?

Notify your transmission and distribution utility within 30 days of installing.

Can renters use plug-in solar in Maine?

Check your lease for placement rules before installing.

Sources

This summary is not legal advice. Confirm the details with the enacted statute, your utility and your local building department before installing.